We were able to supply the entire steel water construction equipment for the new power plant Seidendruckerei in Mitlödi.
2 weir valves | 14.5 m x 2.5 m |
3 inlet protectors | 6.7 m x 1.1 m |
1 dam beam protection | 8 m x 5.5 m |
2 gravel flushing protectors | 2.9 m x 1.3 m |
1 flushing protection | 3.5 m x 2 m |
1 coarse rake | 22 m x 1.1 m |
1 rake cleaning machine, 1 fine rake | 6 m x 5.1 m |