Standing aerial tramway, Villy-Riddes

Renewal

The factory aerial tramway leads from the power plant Riddes to the Wasserschloss Villy. The facility accesses the water palace and is used for maintenance of the pressure line pipes.

In the summer of 2012, we were able to renew the existing aerial tramway. The drive winch incl. control and the vehicle were replaced during conversion.

Technical data

Route length 1790 m
Height difference 909 m
Number of stages 2
Operating speed 1.25 m/s
Engine power 55 kW
Towing rope 20 mm
Payload 6 passengers / 2000 kg