The system was handed over to the customer in September 2011. The builder was the owners' community of Schönberg. This was a conversion project.
The self-running, old facility had been built by Streiff. The track was maintained and only the rack was removed. The chassis, cabin, station doors, drive and control were completely replaced Inside the cabin, the valley-side window can be half-opened so that even bulky goods can be transported.
A small room in the adjacent underground parking facility could be cordoned off, and the new winch and control were placed there.
Route length | 51 m |
Inclination | 31° |
Height difference | 26 m |
Number of stages | 4 |
Operating speed | 0.8 m/s |
Payload | 4 passengers / 320 kg |
Year of build | 2011 |