The largest urban aerial tramway network is currently under construction in La Paz Bolivia. We were able to realize a new 20-person inclined elevator as a feeder for an aerial tramway station.
Route length | 74 m |
Height difference | 26 m |
Number of stages | 2 |
Operating speed | 2.0 m/s |
Payload | 20 passengers / 1600 kg |
Engine power | 90 kW |
Year of build | 2015 |