We were able to renew the aerial tramway to the Bannalpsee lake in Oberrickenbach. The entire drive and the control were replaced in this. A compact system from our compact aerial tramway system was chosen as drive. It could be perfectly implemented into the drive room without any constructional measures. The conversion also included a basic renovation of the drives and cabins. A new telecom rope was installed in connection with the new control and the video system.
Route length | 1'500 m |
Height difference | 679 m |
Number of supports | 2 |
Operating speed | 6.0 m/s |
Engine power | 55 kW |
Carrying rope / towing rope | 30 mm / 16 mm |