We were able to renew the aerial tramway to the Bannalpsee lake in Oberrickenbach. The entire drive and the control were replaced in this. A compact system from our compact aerial tramway system was chosen as drive. It could be perfectly implemented into the drive room without any constructional measures. The conversion also included a basic renovation of the drives and cabins. A new telecom rope was installed in connection with the new control and the video system.
| Route length | 1'500 m |
| Height difference | 679 m |
| Number of supports | 2 |
| Operating speed | 6.0 m/s |
| Engine power | 55 kW |
| Carrying rope / towing rope | 30 mm / 16 mm |