Boat transport facility Hagneck

New construction of special aerial tramway

Construction for the hydropower plant at the Hagneckkanal near the Bielersee lake be complete by the end of 2015. The power plant stands like a dam cross-wise in the Hagneck canal. For ships to be able to pass through the canal anyway, we were able to supply a boat transport facility in the summer of 2013.

The boats are picked up on a vehicle in the water and move around the dam on a rail.

Technical data

Route length 190 m
Maximum boat dimensions 10 m x 2.0 m x 2.4 m
Operating speed 1.0 m/s
Engine power 11 kW
Data protection notice
This website uses external components which can be used to collect data about your behaviour. about your behaviour. Read more about this in our data protection information.
Necessary cookies are always loaded