Herrenknecht group as tunneling company is building a tunnel connection to the existing underground in St. Petersburg. We were allowed to delivery 2 heavy-load winches, including the matching winch cart, for access to the construction site.
Route length | 200 m |
Drive power | 400 kW per winch |
Rope | 2 x ø34 mm |
Winch pulling force | 200 kN |